Challenges
Realization of a a shopping mall, with a market of 6.000 sqm and a retail area of 15.000 sqm. The roof contains photovoltaic panels for the provision of the electricity to the mall. scope of works:urban planning, environmental studies, complete design: preliminary, final and detailed, health and safety during design and construction phases, supervision of works.